Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the olympus-google-fonts domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/ploi/aquia-forensics-new.stagingds.co.uk/public/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the twentytwentyone domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/ploi/aquia-forensics-new.stagingds.co.uk/public/wp-includes/functions.php on line 6114
FPSO VESSEL – Aquila Forensics

FPSO VESSEL

Our professionals were engaged for the provision of expert witness services in a dispute totalling $500 million. The dispute involved a construction company in an ICC arbitration with a major oil company and related to the delays and additional construction costs in the delivery of a FPSO platform. 

PROJECT

The unit is capable of generating 100 MW of electricity, equivalent to the consumption of a city of 330,000 inhabitants. In addition to the modules, the FPSO also comprises a pipe-rack (structure for piping), helideck, flare and accommodation, and is 119m in tall, 330m long and exceeds 60,000 tonnes. 

Aquila Forensics’ professionals were engaged to provide advice, assistance and expert witness services during arbitral hearings on detailed technical and commercial matters relating to an FPSO in South America. 

Once completed, 15 modules were transported by barges and delivered, where they were hoisted on to the ship’s hull and connected for subsequent commissioning and testing, which finalised the construction of the FPSO. 

As the project itself involved about 5,000 direct jobs and 15,000 indirect jobs and over 16.5m man hours worked, Aquila Forensics’ detailed investigations required complex analysis of various trades and productivities at all stages of construction.